Tempe South Wastewater Treatment Plant Laboratory

TEMPE SOUTH WASTE WATER TREATMENT PLANT LABORATORY | TEMPE, AZ | 10,000 SF

Deutsch provided construction documents and LEED documentation services for the design of a 10,000 SF state-of-the-art environmental laboratory building that meets all state and federal water testing regulations. The project was designed to reach LEED Silver certification. Deutsch was part of a larger team that is providing the City of Tempe with new upgrades to the facility in order to improve plant operations and to provide additional treatment abilities as required to meet upcoming water quality regulations, in particular the stage II disinfection by-product rules. The final upgrades to the water treatment plant include the following: enhanced coagulation improvements; chlorine dosing system; reservoir dewatering system; finished water pumping station; new environmental testing laboratory; well water blending; security lighting; and disinfection by-product remediation.

Related Projects