Yulex Manufacturing Facility

YULEX MANUFACTURING FACILITY | CHANDLER, AZ | 40,000 SF

Yulex®  commissioned Deutsch Architecture to design a new Chandler facility, to replace their facility previously located in the City of Maricopa.  The new production facility will be located within an existing 40,000 SF pre-engineered metal building that was modified into a fully enclosed building.  This initial Phase I Process Line will be located in the East portion of the building and will also incorporate chemical storage, packaging and compounding, maintenance, as well as a lab, break room, offices, and restrooms.

Related Projects