Public Work Fred Deutsch Public Work Fred Deutsch

Bombardier Sky Train Maintenance Facility

Bombardier Sky Train Maintenance Facility | Phoenix, AZ | 28,000 SF

This project includes an approximately 28,000 SF addition and renovation of the existing Sky Train operations, maintenance and storage facility. The existing heavy and light maintenance bays are modified to accommodate a better workflow with the new maintenance bays, as well as approximately 5,250 SF of additional storage. Other work on the site includes a drive through train wash station, covered maintenance vehicle storage and an extensive canopy.

Amenities

  • Heavy and light maintenance bays

  • Train wash bays

  • On-site vehicle and equipment storage

Services

  • Architectural and engineering design

  • Construction administration

  • Programming

Read More
Public Work Kris Bullock Public Work Kris Bullock

Tempe South Wastewater Treatment Plant Laboratory

TEMPE SOUTH WASTE WATER TREATMENT PLANT LABORATORY | TEMPE, AZ | 10,000 SF

Deutsch was chosen by the City of Tempe for the LEED design of a 10,000 SF state-of-the-art environmental laboratory building that meets all state and federal water testing regulations. The project was designed to reach LEED Silver certification. Deutsch was part of a larger team that is providing the City of Tempe with new upgrades to the facility in order to improve plant operations and to provide additional treatment abilities as required to meet upcoming water quality regulations, in particular the stage II disinfection by-product rules.

Amenities

  • Enhanced coagulation improvements

  • Chlorine dosing system

  • Reservoir dewatering system

  • Finished water pumping station

  • New environmental testing laboratory

  • Security lighting

  • Disinfection by-product remediation

  • Administrative offices

Services

  • Architectural and engineering design

  • Interior design

  • Construction administration

  • LEED certification

Read More
Public Work Kris Bullock Public Work Kris Bullock

Chandler Fire Station 2810

Chandler Fire Station 2810 | CHANDLER, AZ | 9,000 SF

Deutsch provided programming, design, contractor procurement and construction administration for this single-level, 3-bay fire station. It is based on a previous successful Chandler Fire Station, also completed by Deutsch.

The design is a large,

Amenities

  • Open floorplan with ease of access to the apparatus bays

  • Three-bay fire engine storage and alternative response van

  • Fire inspector office

  • Satellite CAD Station

  • Living quarters

  • An outdoor patio/barbecue area

Services

  • Architectural and engineering design

  • Programming

  • Interior design

  • Construction administration

Read More
Public Work Kris Bullock Public Work Kris Bullock

Phoenix Fire Station 54

PHOENIX FIRE STATION 54 | PHOENIX, AZ | 13,850 SF

Deutsch designed this four-bay sustainable fire station adapted from the Fire Station 50 platform we previously designed.  Fire Station 54 houses a paramedic unit, ladder company, fire inspector and all areas necessary to provide living quarters in a home-style setting.  Deutsch provided programming, design, contractor procurement, and construction administration services.

Read More
Public Work Kris Bullock Public Work Kris Bullock

Phoenix Fire Station 50

Phoenix FIRE STATION 50 | PHOENIX, AZ | 13,850 SF

Fire Station 50 is the first of its kind, with four drive-through bays. The station graces its neighborhood with a beautiful desert-inspired, terra-cotta color palette, and provides substantially reduced operating costs as their first LEED certified building. Deutsch provided architectural services, extensive community involvement coordination, programming, LEED certification, contractor procurement and construction administration services

Read More
Public Work Kris Bullock Public Work Kris Bullock

Chandler Fire Station 288

Chandler FIRE STATION 288 | CHANDLER, AZ | 9,300 SF

Deutsch designed Chandler’s first CMAR project, a single-level, three-bay fire station with an open floorplan for ease of access to the apparatus bays from every point in the station.  It houses fire engines, an alternative response van, fire inspector and provides living quarters. The outdoor patio area, creates a friendly, community-oriented environment.  Deutsch saved the City budget costs, which allowed the City to increase the scope of the project.  Services provided include programming, design, contractor procurement and construction administration.

Read More
Public Work Kris Bullock Public Work Kris Bullock

Chandler Fire Station 281

chandler FIRE STATION 281 | CHANDLER, AZ | 13,000 SF

Deutsch provided programming, design, contractor procurement and construction administration for this three-bay fire station.  This station included a battalion chief headquarters, was slightly modified from an existing floor plan Deutsch created for Chandler Fire Station 288. The design was so successful, the City asked us to utilize it for their Fire Station 2810 as well. Each of the stations have customized exterior facades to fit within their neighborhood. The station utilizes reclaimed water, as well as Xeriscape landscaping. This station has also incorporated the use of photovoltaics located on covered parking on site, as well as a solar hot water heater.

Read More
 
 
 
 
 
 
 
 